Construction & Industrial · North Wales
Point of Ayr Gas Terminal, Liverpool Bay CCS Project
During the transformation of the former Point of Ayr Gas Terminal for the Liverpool Bay Carbon Capture and Storage project, Avian Environmental UK delivered a sustained three-month bird management programme through a complex period of demolition and site preparation.
50–65
Gulls recorded,
early monitoring
3
Month sustained
programme
0
Gulls recorded in monitored operational
areas at programme end
Operational Challenge
Large gull populations had established nesting and roosting on derelict terminal structures. Active demolition and ground works created continual disturbance and attracted further bird activity. The site required consistent, scheduled bird management across a three-month window.
Our Approach
Specialist falconry deployments were coordinated around demolition activities and plant movements, using peregrine falcons and a gyrfalcon alongside trained Harris's hawks. The programme was adapted to the site's operational requirements and concerns about gull chick welfare, maintaining a predator presence to discourage gull activity in monitored working areas.
Results
Gull numbers reduced from an early-programme count of 50–65 birds to zero recorded at programme end. The site proceeded through its critical preparation phase without wildlife-related disruption.
Delivered through NBC Environment within a BAM-managed site environment. June–August 2026.
Full case study →